Product updates

Follow new updates and improvements to Formlio.

April 27th, 2026

We've redesigned the Formlio dashboard to make it easier to manage and browse your interactive documents.

πŸ”Ή Dashboard makeover

  • New dashboard layout: Enjoy a cleaner dashboard layout, improved navigation, and a more intuitive way to manage and see your proposals.

  • Project previews: Browse your projects with preview images and proposal prices, so you can see what's in your pipeline at a glance.

  • Grid and list views: Switch between card view and itemised list view depending on how you prefer to browse your projects.

  • Document statuses: See at a glance if a document is Draft, Published, or Viewed with colour-coded status indicators.

  • New user welcome screen: New users now see a clear welcome message with guidance to create their first document when they first land on their dashboard.

πŸ”Ή Bug fixes

  • My Library: Saved blocks now display with a preview image.

  • Account creation: Fixed a text contrast issue on Windows/Firefox that made dropdown options hard to read.

April 21st, 2026

πŸ”Ή New blocks & editor features

  • Gallery block: Create dynamic image galleries with sliders, scroll animations, and display effects.

  • Big Numbers block: Add animated counters and animated text to highlight key figures in your proposals.

  • Label/tag element: Add badge-style text labels above headings to organise and highlight sections.

  • Header Logo block: Add your logo to proposals by typing "/" and selecting "image" from the dropdown.

  • Hero block carousel arrows: Navigate between images with arrows when multiple images are added to a Hero block.

  • Block Library layout variants: All block layout variants (Slider, Grid, Marquee) now display as individual blocks for easier browsing.

πŸ”Ή Signing & sharing

  • Alternative e-Signature methods Sign documents by drawing or typing your signature, in addition to the existing method.

  • Agreement block signer name See the name of the client who approved the document directly on the agreement block.

  • Project templates Select a template when creating a new project to get started faster.

πŸ”Ή Bug fixes & improvements

  • Price quote: Fixed tax not showing in total, missing subtotal box, tax auto-applying after deleting groups, and added option to hide Investment Summary in Package pricing.

  • Anonymous analytics: Anonymous form respondents now display with generated names and icons instead of "Anon" IDs.

  • Editor: Fixed hyperlinks prepending Formlio subdomain to external URLs, animated text line breaks not preserving, and batch image upload issues in Media Library.

  • Analytics: Fixed sidebar layout alignment and performance degradation on large documents.

  • Mobile: Fixed navigation menu bar displaying incorrectly with section names barely visible

  • Dashboard: Fixed "Save as template" error, team member removal error, and collaborators without a name now show their email address.

  • Other: Fixed Timeline block duration unit selector not visible, YouTube video black screen, and personal settings region inputs not saving.

March 20th, 2026

⭐ New: Publish & Share Experience

We've completely rethought how you share your interactive documents. You now have 3 sharing modes to choose from based on your needs:

  • Private Link: Only invited people can access the document and collaborate in real time. Others can request access. You get notifications and full named analytics, so you know exactly who viewed and interacted with your document.

  • Public Link: Anyone with the link can view and interact with your document. You get notifications and anonymous analytics to track engagement.

  • Open Link: A public page visible to everyone and indexed by search engines. Ideal for portfolios and prospecting documents. You get anonymous analytics.

πŸ’‘Β For Public and Open links, visitors don't need to authenticate and remain anonymous unless they complete a form (e.g., agreement/approval), which requires authentication. At that point, their identity is captured and they are no longer anonymous.

πŸ› οΈ Bug Fixes & Improvements

  • Text Editor: You can now type the "/" character as text without the command menu intercepting it.

  • General improvements: Changes made to the editor, some blocks and Styling Studio to improve user experience.

February 23rd, 2026

πŸ“±Mobile Responsiveness

  • Block layouts β€” Optimised layout and styling for Timeline, and Text blocks on mobile and tablet devices.

  • Font scaling β€” Font sizes scale down on smaller screens to prevent overflow.

  • Gallery grids β€” Galleries switch from multi-column grids to a single or two-column layout on mobile.

  • Stacked layouts β€” Side-by-side layouts stack vertically on narrow screens for better readability.

⭐ Avatars

Users and clients now have a default avatar. You can replace it with a custom image in your account settings.

πŸ› οΈΒ Bug Fixes & Improvements

  • Viewing sessions notifications β€” Fixed duplicate email and inbox notifications when a client starts a viewing session.

  • General improvements β€” Various fixes and enhancements for a better user experience.

πŸ”— New Sharing Experience (Coming Soon)

We've started rethinking how you share your interactive documents. The new sharing flow will let you choose the best option based on your needs, including a public link and more sharing methods. This is still a work in progress. Stay tuned!

Your feedback matters!
If you haven't explored Formlio recently, we'd love for you to log in and let us know what you think. Thanks in advance!

February 16th, 2026

New

⭐ New: Pricing Block

We're thrilled to introduce the Pricing Block, a powerful new way to present pricing, quotes, and packages directly inside your Formlio documents.

Here's what's included:

  • Two layout styles β€” Choose between a clean List view or a visual Grid view with cards, each with auto-aligned totals and clear pricing hierarchy.

  • Interactive selection modes β€” Set sections as Mandatory (all included), One choice (single select), or Optional (multi-select) so clients can customize their own package.

  • Discounts at every level β€” Apply discounts to individual items, groups, or entire sections, with clear visibility in both List and Grid layouts.

  • Multi-currency support β€” Search currencies by name or keyword, with standardized symbol formatting across your documents.

  • Column layouts for intro sections β€” Add title and description areas with flexible width and column controls to frame your pricing.


🎨 Custom Color Palettes in the Styling Studio

  • Save and manage multiple color palettes β€” Create your own custom palettes in the Styling Studio and switch between them across documents. Your brand colors, always one click away.

  • Expanded theming for the Pricing Block β€” Color palette and theme mapping now covers captions, totals, and accent elements within pricing sections.


πŸ› οΈ Editor Improvements

  • Timeline/Gantt editing β€” "Edit" actions are now easier to discover and access in Gantt Timeline.

  • Icon color editing β€” A new "Edit Color" button is now visible directly in the icon selector.

  • Image reordering fix β€” Fixed errors and broken behavior when reordering images in Gallery, Portfolio, and Hero blocks.


πŸ” Media & Search

  • Faster Pexels loading β€” Improved loading and rendering speed when importing images from Pexels.

  • Pexels search bar β€” Fixed inconsistent positioning of the search bar in the Pexels image library.

February 9th, 2026

New

Users can now switch between Dark and Light modes based on their preference.